Home / Birmingham tiling prices

How much does a tiler cost in Birmingham?

Every job is different, so Rock does not work from a price list. He measures your room for free and gives you one fixed labour price in writing before any work starts. Here is what that price depends on.

What decides your labour price

Every room is different, so Rock measures in person for free before giving a fixed written price. These are the exact factors that move a tiling quote up or down:

Factor Why it changes the labour time
Area size (m²) Larger open areas lay faster per square metre than tight WCs or utility rooms packed with corners and cuts.
Tile material and size Large-format rectified porcelain (600x600 mm and above), natural stone, and tiny mosaics take longer to cut, back-butter and keep dead flat than standard ceramic tiles.
Pattern and details Herringbone, chevron, patterned geometric borders, recessed shower niches, mitred edges and window reveals require precision setting-out and extra cuts.
Subfloor or wall preparation Uneven concrete floors need self-levelling compound, timber floors need cement boards fixed down first, and showers or wet rooms need waterproof tanking before tiling.
Old tile removal (optional extra) Rock can strip old tiles and price that clearly as a separate line item. Removing rubble off site is not included, so a skip or tip run is needed.

Rock prices each job as a fixed total in writing, not an open-ended day rate, so you know the cost before he starts.

How labour-only pricing saves you money

Zero mark-up on tiles

You pick the exact tiles you want from any local showroom or online supplier and pay the retail price directly.

No guesswork or wasted boxes

After measuring for free, Rock sends a written shopping list specifying exact square metres (including cut wastage), the right flexible adhesive for your subfloor, grout, trims and tanking.

Fixed written quote, zero deposit

Any levelling, boarding or old-tile removal is agreed in writing beforehand. You pay nothing upfront and settle when the job is finished.

Next step: prepare before you buy

Not bought your tiles yet? Read Rock's tile buying and room preparation guide before ordering so you avoid common costly mistakes.

Get a free written quote

Fill in three details, then pick how to send them. Glen, Rock's son, replies every day.

What needs tiling?
How do you want to send it?

Your message opens ready to send, with these details already filled in. Add two or three photos of the room before you send it.

Prefer to talk it through?

Call, text or WhatsApp Rock on 07727 663664: it is all one number. If he is tiling and misses you, he will ring back.

What happens next

  1. You get a reply to confirm the details.
  2. Rock visits to measure, free of charge.
  3. You receive a fixed labour price and your shopping list in writing.

When you can reach us

  • Mon
  • Tue
  • Wed
  • Thu
  • Fri
  • Sat
  • Sun
Calls and messages7am to 11pm
Rock on the jobabout 9am to 5pm, up to 7pm

He can start earlier or later, and stay longer or shorter, to suit you.

Call Rock WhatsApp